WGK PROJECTS
Frederick County, MA Raw Water Intake and Pump Station Improvements
Improvements to minimize frazile ice formation in the intake channel by installing a Tideflex coarse bubble diffuser system and hybrid blowers. Additionally, our team will be replacing all of the stations hydraulic cylinders and the hydraulic power unit. This system allows for maintenance and operations personnel to isolate portions of the facility for repair and provides for flood protection of the building. Other work includes dredging the intake channel and wet well, installing a bypass pumping connection point, and extensive hydraulic tubing and air piping installation.