WGK PROJECTS

City of Manassas, VA Manassas Lake WTP Gravity Thickener Mechanism Replacement

Removal and replacement of a 48” diameter bull gear drive mechanism on the City’s water production facility gravity thickener. The entire walkway bridge and pipe spanning the 50’ diameter tank was removed, sand blasted and re-coated while the old drive mechanism was removed and replaced. WGK provided turnkey services and completed the work on time and within budget.