WGK PROJECTS
City of Winchester, VA Percy D. Miller WTP Raw Water Pump Station Generator Replacement
Removal of a 750kW diesel generator and 2500 gallon buried fuel storage tank and installation of a 1000kW diesel generator with a 6,000 gallon fuel storage tank. Project for the Water Supply and Wastewater Treatment Division that required maintenance of standby power system with minimal interruptions during construction. Projected Completion: September 2019